Trime has designed and developed a zero emission lighting set entitled the ‘X-Rail Kit’.

The new equipment comprises nine connectable masts, a 200 amp/hour lithium battery and a battery recharging pack. The battery and battery-pack feature useful carrying handles and each is enclosed in sturdy casing. Also included in the kit are nine 12-metre connection cables. The X-Rail Kit is entirely portable, with the individual masts weighing just 12kg, and the battery and battery-pack both weigh 13kg.

The energy saving LED lamps deliver up to 1300 square metres of illumination, which will operate for over 40 hours on a single charge. The complete unit can be recharged in only three hours and 40 minutes.

The Trime X-Rail Kit uses no fuel, emits zero emissions and operates completely silently. Up to 42 X-Rail Kits can be transported on a single truck. Preparing a series of X-Rail Kits for use on a trackside project is quick and uncomplicated.

The Trime Group has over 50 years of experience in the manufacture, development and marketing of environmentally sustainable lighting sets for the rail, off-shore, event, construction and rental markets.

www.trimeuk.com